Kraft Foods
Kraft Foods crane and rigging job in Decatur, GA.
Georgia Pacific
Georgia Power Project, now known as Georgia Pacific, in downtown Atlanta.
Hershel Lynch took a one-day journeyman ironworker job with Superior. He didn’t know this would be the start of a very successful thirty-five-year career with Superior.
Apparel Mart
Major Apparel Mart project begins. Superior added 7 floors to the Apparel Mart building in downtown Atlanta. Benny estimated the job and Hershel was the superintendent.
C&S Bank Jack-Down
Superior completed the C&S Bank Jack-Down which was a complex demolition in downtown Atlanta.
Georgia Dome
Superior completed the structural steel for the construction of the Georgia Dome.
Dick Doughty retires. Patrick Lewis moves into the office in sales role.
Summer Olympics Project
Superior constructed the Olympic bridge, assisted with structural steel in the stadium and completed many miscellaneous projects around the city of Atlanta for the 1996 Olympics.
Hulk Installation
The Hulk was installed at Universal Studios in Orlando, FL. This was the first ride at Universal and Superior’s first roller coaster installation. Hershel was the superintendent and Patrick was the salesman. It was one of Patrick’s first major jobs as a salesman.
Benny and Charlie retired. Patrick Lewis and Hershel Lynch take ownership of Superior.
Kia Plant
The Kia Plant was Superior’s largest steel job to date at the time.
Amway Center
Over 9,400,000 pounds of steel were made to complete this 875,00 square feet project. Superior handled all steel erection.
JetBlue Park at Fenway South
A 50,000 square-foot training center built upon 120 acres with a 12,000-seat stadium.
Pandora – The World of Avatar
Disneyworld – Steel Erection
Hershel Retires
Velocicoaster at Universal
Camping World Stadium
SRE served as the rigging and steel erection partner for Barton Malow, general contractor, on the reconstruction of Camping World Stadium.
Florida Can Manufacturing
In February 2022, Superior Rigging & Erecting Co. successfully completed the installation of the equipment line, conveyors and structural steel platform installation for Roeslein & Associates new 304,000 SF aluminum can manufacturing and warehouse facility.